Projects
Agnes Street Force Main Upgrade
CompletedContinuing with the need to move more wastewater flow to the treatment facility, the old force main from Agnes Street to Depot Street was upsized and directed into a larger collection main. The old force main created a bottleneck and contributed to occasional overflows at the Agnes Street Pumping Station.