Skip to content

Projects

Ward’s Run Interceptor Rehabilitation

Current

PUB has identified a 1,500 foot section of the Ward’s Run interceptor that is creating a bottleneck and allowing overflows. PUB is planning to increase the size of this section of interceptor from a 12-inch to 18-inch line.

© 2024 Copyright - Parkersburg Utility Board  •  Website Design & Development: Mind Merge Design